2020 Slovnaft, a.s.

2020 Refinery Slovnaft, a.s.

Project duration: 5 months

Scope: Assembly and pre-production of pipelines, pipe distributions, supports and storage

Activity:

  • Prefabrication of pipelines on site
  • Installation of pipelines, pipe distributions according to drawing documentation
  • Welding work – TIG welding method
  • Preparation, production and assembly of supports and pipe supports